You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Tošanovice-Žukov Bridge, Czech Republic

Dados de projecto

Localização: Ostrava, República Tcheca

Design: steel composite bridge
Length: 720 m

Requisitos

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Cliente

Metrostav a.s., Division 4, Prague

Benefícios para o cliente

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

Soluções PERI

Two modular formwork carriages from the VARIOKIT system