You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

JKG Tower at Jalan Raja Laut, Malaysia

Dados de projecto

Localização: Kuala Lumpur, Malásia

  • JKG Tower high-rise complex, 32-storey office tower and 13-storey parking facility
  • Completion of shell in approx. 26 months

Requisitos

  • High safety requirements
  • Tight schedule called for completion of 3 floors per month
  • Tight budget restraints
  • Varying floor heights of 4.30 m through to 6.00 m
  • Different slab thicknesses of up to 1 m

Cliente

/master/projects/jkg-tower-at-jalan-raja-laut

Benefícios para o cliente

  • Increased safety and productivity through trained and safe handling of the PERI systems
  • Pleasant, stress-free and safe working conditions at great heights through an air-permeable enclosure
  • Mobile self-climbing devices for the protection panel reduced all crane requirements
  • Fast storey construction time of 3 floors per month
JKG Tower: Kim Fook Wong, Construction Manager
Kim Fook Wong
Construction Manager

Together with the PERI engineers, we developed a very effective and efficient solution for this unique project. Thanks to the PERI system solutions, we could maintain the fast construction cycles. The PERI RCS P climbing protection panel also enhanced the safety measures on the jobsite. In addition, the support provided by PERI regarding the organization and implementation of on-site safety training increased the all-round safety for the construction crew as well as raising the productivity.

Soluções PERI

  • Complete solution, complemented by planning services and a PERI supervisor on site
  • Individual safety training for the construction team on the jobsite
  • Fast and cost-effective realization of the core walls with VARIO GT 24 girder wall formwork on CB 240 climbing brackets
  • Adapting to project-specific requirements with PERI RCS rail climbing system
  • RCS P climbing protection panel as anti-fall protection at great heights
  • Easy adaptation to suit the varying floor heights of 4.30 m to 6.00 m with PERI PD 8 slab tables