You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Der Neue Zollhof (The New Zollhof), Germany

Dados de projecto

Localização: Düsseldorf, Alemanha

Extraordinary group of buildings within the cultural and media mile along the Rhine harbour in Düsseldorf. The three blocks of houses, which are up to 55 m high, consist of reinforced concrete bodies that are moved into each other and warped.

Construction period: 1996-1998

Architect: Frank O. Gehry

Requisitos

Unique building geometry out of doubly curved free-form surfaces

Cliente

Philipp Holzmann Bauprojekt AG

Benefícios para o cliente

  • complex building geometry shuttered with system parts
Werner Meyer, Main foreman, Der Neue Zollhof
Werner Meyer
Main foreman

For this extraordinary building, an enormous degree of expertise and flexibility on the spot is required.

Soluções PERI

  • slab formwork solution with SKYDECK, filler areas with triangular frames and filler units supports
  • TRIO as base for the support of the CNC-milled polystyrene moulds
  • inclined column formwork with RAPID, adjustment via wedges