You are on PERI's international website. Click here to switch to PERI USA. Click here to view all PERI websites.

Canal bridge over the river Elbe, Germany

Dados de projecto

Localização: Magedeburg, Alemanha

  • longest canal bridge in Europe as connection between the two canals Elbe-Havel-Kanal and Mittellandkanal
  • structure: foreland bridge; 690 m long, 34 m wide
  • structure: river bridge; 228 m long

Requisitos

  • fabrication of 17 piers rounded like ship bows
  • fair-faced concrete with smooth, light-coloured surface and defined plywood joints and tie layouts

Cliente

ARGE Kanalbrücke Magdeburg
Bilfinger Berger Bau AG; Dillinger Stahlbau GmbH; Bilfinger Berger, Schalungsbau Roxheim

Benefícios para o cliente

  • cycle fabrication of the foreland piers
  • high surface quality

Soluções PERI

  • VARIO solution for the 17 foreland piers with freely selectable tie positions and acid-proof birch panel
  • climbing formwork for both river piers with 7 sections and concreting heights between 2.45 and 2.87 m
  • VARIO wall formwork elements delivered in a preassembled manner